National Postal Service: Lean Transform

Home » Resources » Case Studies » National Postal Service: Lean Transform

Leading Edge Group developed a plan to allow the client to manage increased peak demand. Lean principles were deployed including value stream design mapping, standard work and demand/capacity modelling to identify inefficiencies and allow operating units to align capacity in advance. This resulted in:

  • A doubling in parcel volumes
  • Sustainable culture of continuous improvement
  • 100% increase in parcel volume during peak demand
  • 25% increase in productivity across their parcel hubs
  • Financial savings in excess of €17m over an 8-year period

Other Case Studies

How to Get the Most from Your Digital Transformation

There is wide acknowledgement that we need to look at digitalizing the way we work…

Town of Paradise
The Paradise Way: Continuing to Improve in the Face of Adversity

In 2019, Town of Paradise engaged Leading Edge Group to provide Lean training and support…

Aerial view of Gravenhurst
The Town of Gravenhurst: A Continuous Improvement Journey

By embracing Lean principles, the Town of Gravenhurst has established a systematic approach that fosters…

Lean Transformation in the Pulp and Paper Industry

The Challenge Leading Edge Group was engaged by the client to implement a Lean Transformation…

Contact Us

Please call or email us with any queries regarding our Lean Belt training programs.

Europe - Ireland

Rossleague,
Cobh,
Co. Cork,
Ireland,
P24 AD90

Tel: +353 (21) 4855863

Email: info@leadingedgegroup.com

North America - Canada

60 St. Clair Avenue East Suite 805,
Toronto, ON,
M4T 1N5,
Canada

Tel: +1 (416) 637 5074

Email: info@leadingedgegroup.com

Oceania - Australia

LEI Group Australia
1/76 Heller St
BRUNSWICK WEST
VIC 3055

Tel: + 61 (03) 9854 6136

Email: info@leadingedgegroup.com